Chapter 4: From Requirements to an Iteration

SE506: Object Oriented Development and Agile Practices

Dr. Polla Abdulhamid Fattah
Department of Computer Science & Artificial Intelligence
University of Kurdistan Hewlêr (UKH)

Chapter Roadmap (1 of 3)

  • 4.1 What are we building? Vision, scope and constraints
    • A bounded outcome, a visible boundary, small decision records.
  • 4.2 Sketching the screens and walking through examples
    • A wireframe is a question made visible.
  • 4.3 Prioritisation and vertical slicing: what first, how thin?
    • Slice by a user outcome, not by technical layer.
  • 4.4 What can we really finish? Release outlook and iteration planning
    • Capacity in person-hours, and why the total is not enough.

Chapter Roadmap (2 of 3)

  • 4.5 How the team works together: agreements and review
    • How work moves, who reviews, what evidence a reviewer needs.
  • 4.6 A starter build and CI you can run
    • One meaningful command, Arrange-Act-Assert, a hosted workflow, a failure you can observe.
  • 4.7 Getting ready for Milestone 1
    • An evidence trail, rehearsed from another person’s starting point.
  • 4.8 Challenging an overambitious plan with AI

Chapter Roadmap (3 of 3)

  • 4.9 Planning mistakes that look reasonable
  • 4.10 Try it yourself: prepare for the kickoff
    • Eight steps on your team’s project.
  • 4.11 Questions to think with and 4.12 A different setting: the transfer challenge
    • A clinic appointment-slot system.
  • What to take away, and what comes next
    • Chapter 5 examines responsibilities, extension and substitutability.

Learning Outcomes (1 of 2)

By the end of this chapter, you should be able to:

  1. Define a project vision with explicit scope, assumptions and constraints.
  2. Slice a feature into a small increment that supports an observable user outcome.
  3. Form an iteration plan that includes implementation, review, verification and realistic capacity.

Learning Outcomes (2 of 2)

  1. Apply a shared repository workflow with clear review responsibilities.
  2. Run a starter build and checks, and demonstrate that the checking process detects a deliberate failure.
  3. Assemble traceable evidence for the kickoff milestone.

Module Connection

  • The chapter prepares you for Milestone 1 (the Week 3 kickoff). It supports LO5 and LO6.
  • The descriptor’s term Sprint 0 is the local kickoff label. It is not a formal Scrum event.
  • It supplies preparation guidance, not new assessment weights, submission rules or approved module wording.
  • Readings: the planning and testing chapters of Martin, and the sprint-planning chapters of Rubin.

Prerequisites and Route

  • Prerequisites: the Chapter 2 Java version; Chapter 3’s ordered backlog and Definition of Done; basic Git operations.
  • Tools: a Java 17 JDK, Git and Bash. On Windows, use Git Bash or WSL.
  • Core reading: 4.1 to 4.7, running the supplied checks while reading 4.6.
  • What you must do: steps 1 to 8 of Section 4.10 on your team’s project. Start steps 6 and 7 (hosted CI) early.
  • If you want more: the AI activity, review questions, transfer challenge and extension.

Opening Scenario: A Kickoff With Ideas but No Boundary

  • The team arrives at kickoff with six backlog items and a working Java reservation coordinator.
  • One member wants a mobile interface. Another proposes a database. A third wants to complete every story before inviting feedback.
  • Everyone is busy.
  • Yet nobody can describe what an equipment officer will be able to demonstrate at the end of the next iteration.

The Difficulty Is Not a Shortage of Ideas

  • It is the absence of a shared boundary and a credible route from an idea to evidence.
  • A backlog tells the team what might be valuable.
  • An iteration plan must also explain:
    • what it will try to achieve,
    • what it can reasonably finish,
    • how another person will know that it worked.

What This Chapter Builds

  • A bounded project vision.
  • A thin user journey.
  • A capacity-aware plan.
  • A repository that runs supplied checks.
  • The existing reservation behaviour is preserved. The availability enquiry (US-02) remains proposed work.
  • Preparing delivery evidence is progress, but it must not be reported as newly implementing behaviour already in the starter.

4.1 What Are We Building?

Vision, scope and constraints

A Vision Explains Whose Problem and What Improvement

  • It should guide choices when time is limited.
  • “Build a complete equipment platform” provides little help: almost any proposed feature can be justified under it.
  • A useful vision identifies an actor, an observable improvement and the setting where the claim can be evaluated.

The Working Vision

Help an equipment officer demonstrate clear reservation decisions for a small, controlled set of student borrowers and equipment, so that accepted requests can be inspected and conflicting requests do not create overlapping records within one running coordinator.

What the Vision Does Not Promise

  • It is deliberately narrower than a production service.
  • It does not promise:
    • authentication,
    • a maintained inventory,
    • safe operation by several officers at once.
  • The broader direction can include borrowing and returns later. The first evidence stays small enough to inspect.

Product Goal, Iteration Goal, Sprint Backlog

  • A Product Goal describes a future product state toward which the team works.
  • An iteration goal gives the next period of work coherence.
  • Neither is a list of every task.
  • In Scrum, the Sprint Backlog combines the Sprint Goal, selected backlog items and an actionable delivery plan.
  • Our worked plan uses that distinction without assuming a classroom team has adopted every element of Scrum.

Make the Boundary Visible

  • Scope is most useful when it makes decisions easier.
  • Use a short table that distinguishes:
    • present capability,
    • selected work,
    • deferred questions.
  • The next three slides show the table for the Chapter 4 version.

Scope at the Chapter 4 Version (1 of 3)

AreaAt the versionPlanning consequence
Reservation requestExisting Java accepts eligible, non-conflicting requestsVerify and demonstrate; do not rebuild it for credit
Availability enquiryProposed US-02; no query method or interfaceRefine and plan a thin next slice
StorageIn-memory records in one coordinatorRestart loses records; demonstrate in one process

Scope at the Chapter 4 Version (2 of 3)

AreaAt the versionPlanning consequence
Identity and equipmentNonblank identifiers; synthetic examplesNo claim of directory or catalogue validation
Loan periodWhole days; start inclusive, end exclusiveLabel dates and test adjacency
Cancellation and completed loansNot implemented; all stored reservations count as activeClarify lifecycle before adding those stories

Scope at the Chapter 4 Version (3 of 3)

AreaAt the versionPlanning consequence
User interfaceScripted console demonstration; proposed wireframesNo web or mobile implementation required for kickoff
Concurrent useSequential teaching exampleNo claim that a check prevents races across processes

Constraints, Assumptions, Open Questions

  • Constraint: Java 17 compatibility is a chosen technical constraint for this starter.
  • Teaching boundary: using synthetic borrower identifiers.
  • Assumption: an officer can recognise a sample item (an assumption about the demonstration).
  • Open question: the rule about past dates.
  • Labelling all four as “requirements” hides their different owners and consequences.

An Assumption Needs a Trigger

  • Example: “For the controlled demo, the operator uses CAM1 and MIC1 from a supplied list of sample items.”
  • Trigger: “Before opening input to arbitrary equipment, clarify the catalogue authority and unknown-item behaviour.”
  • The trigger connects a temporary simplification to the point at which it becomes inadequate.

A Small Decision Record

  • State: the question, the chosen approach, the reason, the consequence and the review trigger.
  • It need not be a long report.
  • “Use in-memory records for kickoff because the immediate question concerns reservation decisions; records disappear on restart; reconsider when a demonstration must survive restarting.”

“Database Later” Is Not a Decision

  • It records neither the current limitation nor the condition that will make the work necessary.
  • The team could postpone essential persistence indefinitely, or introduce it immediately without a reason.
  • A clear trigger lets the plan change when the evidence changes.

Do Not Settle Every Future Policy

  • Resolve the questions that determine the next slice’s behaviour.
  • Keep other questions visible, each with an owner and a decision point.
  • This supports progress while preventing a temporary assumption from quietly becoming a permanent rule.

4.2 Sketching the Screens and Walking Through Examples

A wireframe is a question made visible

What a Wireframe Is For

  • A lightweight wireframe helps users and developers discuss information, actions and outcomes before spending time on presentation.
  • It may be a table, a sketch or a simple sequence of views.
  • Its value comes from the questions it exposes, not from visual polish.

Questions a Journey Exposes

  • What does the officer enter?
  • Does “end date” include that day?
  • What appears when equipment is unavailable?
  • Does a failed request leave a record?
  • Can the officer distinguish a successful reservation from an availability observation?
  • The next slides are proposed interface sketches, not screenshots of implemented screens.

View A: Request a Reservation

ElementExample or behaviour
Borrower identifierB1
Equipment identifierCAM1
Start date2026-10-20
Duration in days2
Period explanationIncludes 20 and 21 October; ends before 22 October
ActionRequest reservation
Scope noteControlled demo; records last only for this session

View B: Request Outcome

OutcomeInformation shown
ConfirmedReservation R1, B1, CAM1, [2026-10-20, 2026-10-22)
Item unavailableRequest rejected; no new reservation stored
Limit or duration failureRequest rejected; no new reservation stored
Malformed inputThe proposed interface should explain the field to correct

View B: What Is Real and What Is Drawn

  • The coordinator currently returns confirmation or rejection strings and throws exceptions for certain invalid arguments.
  • A future interaction layer must translate malformed input into a useful response. Drawing it does not implement it.
  • The coordinator combines borrower-limit and duration failures in one message.
  • A sketch showing two precise explanations introduces new work the backlog should identify.

View C: Availability Enquiry (Proposed US-02)

ElementExample or behaviour
Equipment identifierCAM1 from the controlled set of sample items
Start date2026-10-22
End date, exclusive2026-10-23
ActionCheck availability
ResultAvailable, unavailable, or an identifiable invalid-period outcome
ExplanationAn enquiry creates no reservation and does not guarantee a later request will succeed

Do Not Choose a Toolkit Yet

  • A user can understand the sketch without agreeing to a particular toolkit.
  • That leaves the team free to use a thin console interaction while learning about the domain.
  • Choosing a web framework now would add configuration and presentation tasks without resolving the date-boundary question.

Walk Through Concrete Examples

  1. Begin with no reservations.
  2. Submit B1, CAM1, 20 October, two days. Expect one stored reservation ending exclusively on 22 October.
  3. Submit B2, CAM1, 21 October, one day. Expect rejection and the original record preserved.
  4. Submit B2, CAM1, 22 October, one day. Expect a second stored reservation.

Why the Last Step Matters

  • Otherwise “no overlap” is ambiguous.
  • If the officer expects collection on 22 October to conflict with the earlier booking, either the period convention or an operational turnaround rule needs discussion.
  • Do not silently add a cleaning interval to the current rule.
  • Record it as a candidate requirement with examples.

For an Availability Enquiry, Record Two Things

  • The displayed answer.
  • The unchanged state.
  • A program that says “available” after quietly creating a reservation has not fulfilled the story.
  • An observation of availability is not permission to reserve: a borrower may already have three active records.
  • The proposed query does not establish borrower eligibility.

Three Descriptions of One Behaviour

  • Wireframes, examples and code are three descriptions of the same intended behaviour.
  • Disagreement among them is useful evidence.
  • Resolve it explicitly, instead of selecting whichever description is easiest to implement.

4.3 Prioritisation and Vertical Slicing

What first, how thin?

Preserve the Backlog’s History (1 of 2)

OrderItemCurrent interpretation
1US-01: Record an eligible reservationCore behaviour exists; confirm interaction and delivery evidence
2US-02: Inspect availability without reservingNew user outcome to refine and forecast
3EN-01: Automate build and checksEnabling work supplied in this chapter; hosted evidence still required

Preserve the Backlog’s History (2 of 2)

OrderItemCurrent interpretation
4US-03: Inspect a borrower’s active recordsFiltering and interaction remain new work
5US-04: Cancel a confirmed reservationAuthority, lifecycle and count effects need clarification
6US-05: Reject unknown equipment identifiersDepends on a catalogue source and failure policy

Order Is Judgement, Not a Rigid Instruction

  • Order is not an instruction to finish every task of one item before examining another.
  • EN-01 supports reliable delivery of US-02, so preparing automation during kickoff is reasonable. Explain that dependency openly.
  • Do not quietly move every technical improvement ahead of user feedback.
  • “Low priority” for catalogue validation is defensible only within the controlled set of sample items.

Vertical Slice

  • A vertical slice passes through the necessary parts of the system to deliver one observable outcome.
  • It need not use a graphical interface, database or network.
  • For this project, a console request that reaches the coordinator and displays a verified decision is a thin journey through interaction, domain behaviour and storage.

Vertical vs. Horizontal

Horizontal splitVertical sliceAll screens firstThen all servicesThen all storageWork exists, but nothing is demonstrable until the end.InteractionDomain behaviourStorageUS-02A thin path through every layer: one observable outcome.

Why Horizontal Splitting Hurts

  • “All screens first, then all services, then all storage” can leave substantial work without a demonstrable outcome.
  • Those activities may be implementation tasks.
  • They do not become useful increments merely because they are separate tickets.

A First Slice for US-02

The officer supplies one sample item and a valid date interval, receives an availability answer based on current reservations, and can verify that the enquiry left every stored reservation unchanged.

What the Slice Defers and What It Cannot

  • Can defer: calendar styling, multiple-item search, live inventory integration, availability across several servers.
  • Cannot defer: overlap semantics and state preservation. They determine whether the promised outcome is true.
  • The slice also needs an identifiable response to an equal or reversed interval.

Acceptance Examples for the Slice

IDGiven and enquiryExpected outcome
AQ-01Empty coordinator; CAM1 [20 Oct, 22 Oct)Available; records unchanged
AQ-02CAM1 reserved [20 Oct, 22 Oct); enquire [21 Oct, 23 Oct)Unavailable; records unchanged
AQ-03Same reservation; enquire [22 Oct, 23 Oct)Available; records unchanged
AQ-04Same reservation; example MIC1 for [20 Oct, 22 Oct)Available; records unchanged
AQ-05Equal or reversed start and endIdentifiable invalid-input outcome; records unchanged

“Records Unchanged” Means Contents Too

  • All dates are in 2026.
  • “Unchanged” means preserving contents as well as count.
  • A query that replaces one reservation with another can leave the same size and still be incorrect.
  • The exact query API and invalid-input representation are design choices to settle before implementation. The existing reserve method is not a query implementation.

When Is a Feature Small Enough?

  • When the team can understand and verify it within the iteration, including integration.
  • Making it smaller by removing meaningful rejection behaviour can produce misleading success.
  • A reservation feature that accepts requests but ignores conflicts is not a safe reduction of this outcome.

Necessary Work vs. Attractive Additions

  • Necessary for US-02: interpreting the interval, inspecting relevant reservations, reporting the result, checking non-mutation.
  • Optional: a calendar widget.
  • A persistent store becomes necessary only when the selected outcome requires data to survive a restart.
  • This lets the team negotiate scope without treating quality as optional.

Epics Group Direction, Not Iteration Size

  • “Reservation decisions” can contain US-01 and US-02.
  • “Record lifecycle” can contain US-03 and US-04.
  • EN-01 supports delivery across them.
  • An epic does not require an architecture layer or a Java package with the same name.

4.4 What Can We Really Finish?

Release outlook and iteration planning

An Outlook Is Not a Commitment

  • A release outlook communicates likely steps toward the product goal, and should show uncertainty.
  • The book’s teaching stages: kickoff makes the baseline reproducible; the MVP stage develops a small reservation and loan flow; later stages add integration boundaries and respond to a changed requirement.
  • These are teaching stages, not evidence that every team can deliver identical scope on identical dates.

Now, Next, Later

  • Use a short outlook with “now”, “next” and “later” if precise forecasts would be invented.
  • Keep the module’s official milestone schedule unchanged.
  • A planning table cannot create a new assessment deadline or promise that a poorly understood story will fit a particular week.

Two Different Goals

Kickoff goal: Make the reservation baseline reproducible and reviewable, and prepare a bounded availability slice for the next iteration.

Candidate next iteration goal: Let the officer inspect availability for one sample item and interval without changing reservations.

What Chapter 4 Provides

  • Chapter 4 provides the first goal’s starter materials.
  • It plans the second goal.
  • It does not claim to have implemented US-02.

Counting Capacity

Four members report 6 + 6 + 5 + 5 = 22 person-hoursReservedcoordination,integration, admin2resolve thequery contract4implement theread-only query3thin interaction,invalid input3query andregression checks2review, notes,rehearsal4unallocated:room for uncertaintySelected work: 14 person-hoursPlanning budget: 18 person-hours

The Arithmetic

  • These figures are invented planning data, not official contact hours or measured productivity.
  • Four members report 6, 6, 5 and 5 person-hours: 22.
  • Reserve four for coordination, integration support and routine administration.
  • The remaining planning budget is 18 person-hours.

Forecast Work for the Next Iteration

Forecast workPerson-hours
Resolve the query contract and update examples2
Implement the read-only enquiry behaviour4
Add the thin interaction and invalid-input response3
Add and run query checks alongside regression checks3
Review, integrate, update notes and rehearse the demonstration2
Selected work14
Unallocated capacity within the 18-hour budget4

How to Read the Estimates

  • They are discussion inputs, independently expressed in person-hours.
  • They are not converted from Chapter 3’s story points.
  • Two people pairing for one hour consume two person-hours.
  • Review and correction must fit in the budget. Calling them “after development” does not make them free.

The Four Unallocated Hours

  • They provide room for uncertainty.
  • They are not a promise to pull in another feature.
  • If the query needs an unexpected policy decision, use the capacity to resolve that risk while protecting the goal.
  • If things finish early, improve evidence or select additional work deliberately.

18 Hours Does Not Establish Feasibility

  • Suppose the only person who can explain the coordinator is unavailable until the last day, while the reviewer is free only at the beginning.
  • The work cannot flow as the arithmetic suggests.
  • Ask when collaboration can occur and whether knowledge must be shared earlier.

Ownership Without Specialists

  • A task owner ensures that progress and questions remain visible.
  • It does not mean nobody else may help.
  • Agree an early pairing session on the query contract and a review window before the final demonstration.
  • A little coordination prevents the entire slice waiting at the end.

When the Evidence Changes

  • If four hours of implementation become nine, discuss the forecast and remaining scope.
  • Do not hide the overrun by postponing checks or declaring the interaction “almost done”.
  • In Scrum, scope can be clarified and renegotiated with the Product Owner while protecting the Sprint Goal.
  • A classroom adaptation should make its decisions visible.

Replanning Example

  • Implementation revised from 4 to 9 hours after a contract ambiguity.
  • Selected work becomes 19 hours: already above the 18-hour budget.
  • Do not preserve the status by removing checks.
  • Revisit the ambiguity and reduce an optional part of the interaction, or revise the forecast transparently.
  • If no coherent verified slice fits, report the outcome as at risk and renegotiate the selected work.

The Practical Replanning Question

What complete, still useful outcome can we verify with the capacity left?

  • Sometimes the answer is a smaller interface.
  • Sometimes unresolved behaviour means the item cannot responsibly be called complete.
  • Honest incompleteness is more useful than a green status that conceals unfinished work.

4.5 How the Team Works Together

Agreements and review

Agree How Work Moves

  • Keep Chapter 3’s board: Backlog, Ready, Building, Review, Done.
  • Combined WIP limit of two across Building and Review.
  • A blocked item still occupies a slot. If review is blocked, helping it finish is usually better than starting a third item.

What a Team Agreement Answers

  • Where do requirements live?
  • How are questions raised?
  • Who reviews a change?
  • What evidence do reviewers need?
  • How is unfinished work reported?
  • The board tool is interchangeable. A shared Markdown table can work if updates are visible and ownership is clear.

Start From What You Decided Earlier

  • The issue board and branch policy from Chapter 2 Part D.
  • The Definition of Done from Chapter 3.
  • Your process note naming which Scrum elements you use as defined and which you adapt.
  • Revise them where experience shows a problem, and record why.

Small, Short-Lived Branches

  • One branch should contain a coherent change another person can understand.
  • “Set up every tool and rewrite the coordinator” is hard to review: functional and workflow changes become entangled.
  • A branch that adds the checking script and its documentation has a clearer purpose.

The Review Loop

Small changeand local checksReview and CIBlockingfinding?Correct and rerunIntegrate andverify theshared branchNoYesA team policy: git does not enforce review by itself.

A Policy, Not a Guarantee

  • This describes the chapter’s team policy. A repository does not enforce review because the README requests it.
  • Where supported, configure the shared branch to require the agreed check and review.
  • If enforcement is unavailable, state that the team follows a manual policy and retain its review evidence.

Review the Claim, the Change and the Evidence

  • Start with the intended behaviour.
  • Trace the relevant code or documentation.
  • Ask whether the evidence supports the claim.
  • “Looks good” alone does not say which risk was examined.

What to Ask About a CI Change

  • Does a compilation failure stop the job?
  • Do the check programs actually execute?
  • Does a failed assertion reach the job result?
  • For US-02 later: does the query mutate state, or depend on a borrower’s eligibility?
  • A code-style comment should not distract from a behavioural defect.

Author and Reviewer Duties

  • The author resolves blocking findings and reruns affected checks.
  • The reviewer inspects the correction.
  • Retain the actual feedback and response. Do not invent a review exchange to fill a template.
  • Working alone permits a documented self-review for practice. It is not independent review and should be labelled so.

Extending the Definition of Done

  • Carry forward Chapter 3: checked examples, reproducible execution, actual review, integrated code, updated notes, repeatable demonstration.
  • Add: the agreed automated check has passed on the integrated revision and the team can locate its result.
  • Acceptance criteria stay specific to a story. A passing pipeline is one part of the DoD.
  • It does not establish that a wireframe was understood or a useful outcome delivered.

Forms in Appendix C

  • C.6: the iteration plan of Section 4.4.
  • C.7: a team agreement.
  • C.8: a pull-request description.
  • C.9: the evidence note of this chapter’s companion.
  • Each form comes with a worked example.

4.6 A Starter Build and CI You Can Run

One command that means something

Make One Command Meaningful

  • CI needs a check that can run without relying on one developer’s open IDE.
  • The starter uses Java 17, Bash and the supplied executable Java checks. No external Java dependencies.
  • Maven and JUnit remain the planned tools for the fuller testing stage. This version keeps the plain-Java checks so kickoff does not need a test framework first.
  • On Windows, run the script from Git Bash or WSL. PowerShell cannot interpret it.

From the Flat Directory to a Conventional Layout

  • Continuing from the flat Chapter 2 directory, the move is mechanical:
    • application classes go to src/main/java,
    • check classes go to src/test/java,
    • their contents do not change.
  • The classes stay in the unnamed package: a layout change only.
  • It is the layout Maven expects, so a later move changes the build file and the checks, not where the sources live.

The Repository Files (1 of 2)

Relative pathPurpose
src/main/java/ReservationRules.javaExisting borrower-count and duration rule
src/main/java/LoanPeriod.javaExisting immutable interval and overlap behaviour
src/main/java/Reservation.javaExisting immutable reservation data
src/main/java/ReservationCoordinator.javaExisting sequential, in-memory reservation operation
src/main/java/Chapter04Demo.javaFixed three-request demonstration

The Repository Files (2 of 2)

Relative pathPurpose
src/test/java/Chapter02Checks.javaExisting 34 regression checks
src/test/java/Chapter03AcceptanceExamples.javaExisting five acceptance example groups
scripts/check.shCompile and execute the agreed gate
.github/workflows/java-check.ymlHosted CI template
.gitignore, .gitattributes, README.mdExclusions, LF endings, setup and scope

The Gate Script

#!/usr/bin/env bash
set -euo pipefail

cd "$(dirname "${BASH_SOURCE[0]}")/.."
mkdir -p build/classes
find build/classes -type f -name '*.class' -delete

java -version
"${CHAPTER_JAVAC:-javac}" --release 17 -encoding UTF-8 -d build/classes \
  src/main/java/*.java src/test/java/*.java
java -cp build/classes Chapter02Checks
java -cp build/classes Chapter03AcceptanceExamples
echo "BUILD AND CHECKS PASSED"

What the Script Does

  • Clears generated class files, then compiles the listed source directories.
  • Runs Chapter 2’s 34 checks and Chapter 3’s five acceptance example groups, then prints a completion message.
  • Compilation targets Java 17 through --release 17; generated classes go into a separate output directory.
  • The script must stop when compilation or either checking program fails. The final message is reached only after success.

Why the Gate Is Built This Way

  • It changes to the project root relative to its own location: independent of the caller’s directory.
  • set -euo pipefail stops on a failing command, rejects unset variables and propagates pipeline failures.
  • There is no || true, no catch-and-ignore handler, no success message issued before checking.
  • Adding another check class also requires adding its run command: compiling does not run a main method.

The Gate as a Picture

Compilejavac --release 17Chapter02Checks34 checksChapter03AcceptanceExamples5 groupsBUILD ANDCHECKS PASSEDany failure stops the script: nonzero exit, no success lineHosted workflow (GitHub Actions template):actions/checkoutactions/setup-javaTemurin 17bash scripts/check.shthe same gate

What a Passing Run Prints

All 34 chapter checks passed.
AC-01 passed
AC-02 passed
AC-03 passed
AC-04 passed
AC-05 passed
All 5 acceptance examples passed.
BUILD AND CHECKS PASSED
  • The five groups contain multiple assertions. Do not add 34 and 5 and call it 39 individual assertions.

What a Pass Establishes

  • The five acceptance examples cover: eligible reservation, overlap rejection, adjacency, borrower limit, duration boundaries.
  • They do not test US-02, because that feature is not implemented.
  • A pass establishes something bounded: the supplied reservation checks passed against this revision in the recorded environment.
  • It is not a claim of complete correctness.

Run the Scripted Journey

java -cp build/classes Chapter04Demo
Confirmed: R1 for B1 on CAM1 [2026-10-20, 2026-10-22).
Rejected: item unavailable.
Confirmed: R2 for B2 on CAM1 [2026-10-22, 2026-10-23).
Stored reservations: 2
  • Fixed synthetic examples. Not interactive. The second request neither consumes an identifier nor creates a record.

Line Endings Can Break the Script

  • Git on Windows may convert LF to CRLF on checkout.
  • A CRLF script fails under WSL or Linux with an error such as set: pipefail: invalid option name.
  • The repository includes a .gitattributes file containing *.sh text eol=lf.
  • Check that it is committed before a teammate tries a fresh clone.

Read a Check as Arrange, Act, Assert

// Arrange: the coordinator already holds B1's reservation of CAM1.
// Act: B2 asks for CAM1 on an overlapping day.
String conflict = coordinator.reserve("B2", "CAM1", day.plusDays(1), 1);
// Assert: the request is refused, and nothing new was stored.
require(conflict.equals("Rejected: item unavailable."), "AC-02 rejection");
require(coordinator.reservations().size() == 1, "AC-02 unchanged count");

The Three Steps

  • Arrange builds the situation.
  • Act performs the one operation under test.
  • Assert states what must be observed, including what must not have changed.
  • A check asserting only the message would pass for a request that was refused but still stored.
  • Chapter 7 names this structure Arrange-Act-Assert and builds on it.

The Hosted Workflow: Triggers

name: Java starter checks
on:
  push:
  pull_request:
  workflow_dispatch:
permissions:
  contents: read
  • Runs on pushes, pull requests and manual dispatch, with read-only access to the repository contents.

The Hosted Workflow: The Job

jobs:
  verify:
    runs-on: ubuntu-latest
    timeout-minutes: 5
    steps:
      - uses: actions/checkout@v7
      - uses: actions/setup-java@v6
        with:
          distribution: temurin
          java-version: '17'
      - name: Compile and check
        run: bash scripts/check.sh

Reading the Workflow

  • Stored under .github/workflows.
  • A hosted Ubuntu runner; Temurin Java 17; the same gate; a five-minute timeout.
  • A push tied to a pull request may produce both kinds of run. The simple template accepts that duplication.
  • A passing workflow does not configure merge requirements automatically.

GitHub Actions Is One Route

  • An institution’s alternative CI service is suitable if it checks the intended revision, runs the agreed command and preserves inspectable results.
  • A badge or YAML file alone is not a passing run.
  • Confirm that the workflow actually starts and that its compilation and checking steps execute.

Record the Run

  • The revision.
  • The environment.
  • The command.
  • The result, with a link or exported log.
  • For a pull request, identify the tested revision. After integration, retain the shared branch’s passing result too.
  • A branch check can become stale after another change is integrated.

Version Selectors Can Move

  • The example uses a Java major version and action major tags for readability.
  • Those selectors can resolve to updated releases, so record the resolved versions in evidence.
  • Stronger dependency pinning, wider environment coverage and delivery stages belong in Chapter 13.

Prove That a Failure Is Observable

  1. Begin with a passing run.
  2. On a disposable branch or copy, change one acceptance check to expect two records after the first successful reservation.
  3. That expectation is intentionally wrong: valid behaviour stores exactly one.
  4. Run the same gate and expect a nonzero result identifying AC-01.

The Deliberate Failure

// original
require(coordinator.reservations().size() == 1, "AC-01 one record");
// intentionally wrong, on a practice branch only
require(coordinator.reservations().size() == 2, "AC-01 one record");
All 34 chapter checks passed.
Exception in thread "main" java.lang.AssertionError: AC-01 one record
  • The author run returned exit status 1. BUILD AND CHECKS PASSED must be absent.

Restore and Retain Evidence

  • Restore the correct expectation and run again.
  • On a hosted practice branch, retain the failed run and the restored passing run.
  • Never merge the deliberate defect into the shared baseline.
  • A local copy proves local failure propagation but not hosted CI. Report the distinction.

Environment Failure vs. Assertion Failure

  • A failed download or missing JDK does not prove failure propagation. It shows an environment failure before the assertion was reached.
  • Read the log and identify the actual failed step.
  • Replacing a test command with echo passed makes a green workflow that checks nothing.

Author Verification Boundary

  • Executed locally by the author: compilation, the 34 checks, the five acceptance groups, the demonstration and the failing-check experiment.
  • The GitHub Actions workflow is supplied for learners to run.
  • No hosted execution or independent team review is claimed.
  • Completing the milestone’s hosted CI evidence requires an observed run in the team’s repository.

4.7 Getting Ready for Milestone 1

An evidence trail that agrees with itself

Assemble an Evidence Trail

  • Milestone 1 connects the project direction to an executable starting point.
  • The documents should agree with one another.
  • A vision promising live inventory, a backlog assuming sample identifiers and a demo using invented equipment without explanation leave a reviewer unable to interpret success.
  • The preparation map is a navigation aid, not an extra assessment rubric.

The Preparation Map (1 of 3)

EvidenceQuestion it should answer
Vision and scopeWhose outcome matters, and under which boundaries?
Epics, stories and ordered backlogWhat is supported, what is next, what is uncertain?
Wireframes and acceptance examplesWhat will the officer do, see and change?

The Preparation Map (2 of 3)

EvidenceQuestion it should answer
Capacity and iteration planWhy is the selected work plausible, including verification and review?
Team agreement and review recordHow will changes be inspected and integrated?
Repository and READMECan another person obtain the intended revision and run it?

The Preparation Map (3 of 3)

EvidenceQuestion it should answer
Passing CI resultDid the configured service execute the gate successfully?
Deliberate failure and restored passDoes a failed check produce failure, and is the baseline healthy again?
Decision and limitation notesWhich assumptions restrict the claims being made?
  • Story to acceptance examples.
  • Examples to the checking program.
  • Change to review.
  • Revision to CI result.
  • Links are useful when they let another person answer a question.
  • A large spreadsheet of repeated identifiers adds little if the linked check does not exercise the promised behaviour.

Rehearse From Another Person’s Starting Point

  • Ask a teammate to follow the README from a fresh checkout. Watch where they need undocumented help.
  • Does the command assume a shell they do not have?
  • Is the JDK a development kit or only a runtime?
  • Does the demo require records created in an earlier session?
  • Correct the instructions and repeat the affected step.

Transparent Gaps

  • Do not report an unrun command as verified because it looks familiar.
  • If the hosted service is unavailable, preserve the local evidence and name the missing hosted result as a gap.
  • A transparent gap gives the team a concrete next action.
  • The exit version: a bounded plan, inspectable sketches and a repeatable baseline with a delivery gate.

4.8 Challenging an Overambitious Plan with AI

Verdicts, not vibes

Ground Rules for the Activity (1 of 2)

For this activity
Your goalEvaluate a proposed iteration plan against scope, capacity, behaviour and delivery evidence
You start withThe Chapter 3 backlog, the capacity figures in 4.4 and the Chapter 4 starter
What is in boundsReview and replace the plan; do not implement any feature

Ground Rules for the Activity (2 of 2)

For this activity
How to checkYour capacity arithmetic; the code (is there a query method? does reserve change state?); the actual gate output
How to decideA verdict and reason for each distinct proposal, then a bounded replacement plan
No AI account?The ready-made example is enough
  • Chapter 15 collects the recurring AI workflows. This activity is self-contained.

The Ready-Made Example (1 of 3)

Author-written fictional AI output, constructed for this offline exercise. Not a record of an actual model conversation.

Four students have 22 person-hours, so plan 22 hours of features. Deliver US-02, cancellation, a mobile app, a database and email confirmations. Assign one student to each layer and integrate on the final evening.

The Ready-Made Example (2 of 3)

Convert the three-point availability story into three hours. Show “available” by calling reserve and deleting its record afterwards. Skip failure cases until next sprint.

The Ready-Made Example (3 of 3)

Mark EN-01 complete when the YAML file is committed; a green badge proves the whole story works.

  • Create a review table: a verdict and a reason for each distinct proposal.
  • Replace the plan with a bounded goal, a selected slice, a capacity calculation and explicit evidence.
  • Find at least one domain error, one estimation error, one integration risk and one unsupported completion claim.

Model Critique (1 of 3)

ProposalVerdictReason and correction
Allocate all 22 hours to featuresRejectCoordination, review and uncertainty consume capacity; use the explicit budget
Deliver query, cancellation, mobile, database and email togetherRejectThe selected goal is one query slice; the additions lack agreed requirements
One layer per member; integrate at the endReviseOwnership can help; final-day integration delays learning

Model Critique (2 of 3)

ProposalVerdictReason and correction
Convert three story points into three hoursRejectNo valid conversion was established; estimate tasks from real understanding
Call reserve, then delete the recordRejectA query must not change state; deletion is not even a supplied operation; eligibility differs
Defer failure casesRejectInvalid intervals and non-mutation are part of this outcome’s acceptance

Model Critique (3 of 3)

ProposalVerdictReason and correction
Mark EN-01 complete when YAML is committedRejectConfiguration must execute successfully and detect the intended failure
A green badge proves the whole storyRejectThe gate checks only executed conditions; current checks cover reservation, not US-02
  • A corrected response states the availability goal, AQ-01 to AQ-05, the 18-hour budget and 14-hour forecast, plus review and observed CI evidence.

Independent Verification

  • Trace reserve to its reservations.add call.
  • Observe the absence of a query method.
  • Check the arithmetic.
  • Inspect the actual check output.
  • Asking a second AI model whether the first plan is good does not replace those observations.
  • An AI-use record names: the prompt or example, claims examined, decisions, evidence, remaining uncertainty.

4.9 Planning Mistakes That Look Reasonable

Eight to avoid

Mistakes 1 to 3

MistakeWhy it failsBetter action
Count starter behaviour as newly deliveredHides the actual changeSeparate existing capability from new evidence or functionality
Slice only by technical layersNo usable end-to-end resultSelect one observable journey and its necessary tasks
Fill all nominal capacity with featuresReview, coordination and uncertainty go unfundedBudget those activities explicitly

Mistakes 4 to 6

MistakeWhy it failsBetter action
Use a wireframe as proof of implementationConfuses an agreed sketch with working behaviourLabel proposal and implementation separately
Treat an availability answer as a reservationOmits eligibility and later state changesKeep query and command outcomes distinct
Create CI configuration without running itNo evidence the gate executesInspect an actual run against the intended revision

Mistakes 7 and 8

MistakeWhy it failsBetter action
“Fix” a red job by ignoring its exit statusConceals the defectCorrect the cause; preserve failure propagation
Invent review or meeting evidenceMakes the project state misleadingReport actual observations and remaining gaps

4.10 Try It Yourself

Prepare for the kickoff

Project and Input

  • The activity runs on your team’s project.
  • Equipment lending: the supplied listings are your starting repository.
  • Another provided domain: apply each step to that domain’s starter codebase, using the supplied files as the model for layout, script and workflow.
  • You start with: the Chapter 3 backlog, the current Java baseline and the Chapter 4 repository listings.
  • Do not change domain without following the module’s arrangements.

Instructor Demonstration and Guided Practice

  • Demonstration: walk through the three reservation requests, then compare an ordinary passing run with the deliberately wrong acceptance check. Ask what each result establishes.
  • Guided practice: create a one-page scope statement and wireframe. Have another pair explain the journey back to you. Resolve one discrepancy between their interpretation and your intended behaviour.

Independent Team Work (1 of 2)

  1. Write the vision, boundaries, assumptions and two decision records with review triggers.
  2. Group the backlog into epics, preserve story identifiers, and distinguish existing capability from new work.
  3. Refine US-02 (or an equivalent thin slice) with normal, boundary and rejection examples, including state effects.
  4. Create an iteration goal and capacity plan using your actual availability, with coordination, review and uncertainty shown.

Independent Team Work (2 of 2)

  1. Agree ownership, review and board policies. Apply them to one small repository change.
  2. Create the starter files, run the gate and reproduce the scripted demonstration.
  3. Enable the hosted workflow. Retain a passing run, a deliberate assertion-failure run on a practice branch, and a restored passing run. Record the integrated baseline’s result.
  4. Assemble the evidence map; ask another team member to follow the README from a fresh checkout.

Expected Output

  • Vision and scope notes.
  • Ordered backlog and selected story.
  • Wireframes.
  • Capacity plan.
  • Team agreement and review record.
  • Repository instructions.
  • Verification evidence.
  • Unresolved questions with owners.

Completion Checks

  • Another person can explain the chosen outcome.
  • They can distinguish implemented and planned behaviour.
  • They can run the baseline and locate the actual CI results.
  • They can trace at least one acceptance example to an executed check.
  • A missing hosted run remains an explicit gap.
  • Use the module leader’s submission requirements for the assessed hand-in.

Model Document: Vision and Scope

  • Working vision: help an equipment officer demonstrate clear reservation decisions for a controlled set of student borrowers and equipment, and inspect accepted records without overlapping reservations for the same item in one coordinator.
  • In scope: one item per request; inclusive start, exclusive end; the student rules; deterministic synthetic examples; sequential calls in one process.
  • Outside: persistent storage, real catalogue validation, cancellation, returns, email, concurrency, a polished interface.

Model Document: Open Questions

  • Treatment of past dates.
  • Operational turnaround between loans.
  • Authority to cancel.
  • What “active” means after cancellation or completion.
  • The catalogue source and its failure behaviour.
  • Resolve only those that block the selected next outcome. Attach an owner and a review trigger to the others.

Model Decision Record D-01: Storage

  • Question: must kickoff preserve records across restarts?
  • Decision: keep one in-memory coordinator.
  • Reason: the demonstration evaluates reservation decisions in one session.
  • Consequence: a restart loses records and the identifier sequence restarts.
  • Review trigger: a selected outcome requires a session to survive restart.
  • Status: the existing teaching baseline.

Model Decision Record D-02: Query Interaction

  • Question: what input expresses the query interval?
  • Proposed decision: a start and an explicitly labelled exclusive end.
  • Reason: it makes the half-open interval visible in discussion.
  • Consequence: the officer needs clear date guidance; equal or reversed bounds must be reported.
  • Review trigger: a walkthrough shows persistent confusion or a preference for duration.
  • Status: proposed; obtain team agreement first.

Model Document: The US-02 Contract

  • Story: as an equipment officer, I want to inspect whether one sample item is available for a stated interval, so I can discuss a possible reservation without creating one.
  • Acceptance: AQ-01 to AQ-04 report availability for empty state, overlap, adjacency and a different item; AQ-05 reports an identifiable invalid-period outcome; every enquiry leaves all reservation contents unchanged.
  • Still to decide: the invalid-input representation. Do not present two as simultaneously implemented.

Review Trap: Availability Is Not Eligibility

  • If B1 already holds three active reservations, an unreserved item can be available even though B1 cannot reserve it.
  • Reusing reserve as the enquiry mixes those questions and changes state.
  • Necessary tasks: agree the contract; add a read-only operation; add the thin interaction; test results and non-mutation; review and integrate; update instructions; demonstrate.

Model Team Agreement

  • Keep stories and acceptance examples in shared project notes; preserve identifiers when refining wording.
  • Backlog, Ready, Building, Review, Done; Building plus Review limited to two; blocked items count.
  • Branches small enough for a reviewer to explain.
  • Authors run the gate before review and after corrections. Reviewers inspect behaviour, state effects and evidence.
  • Record the shared branch’s check result after integration. Mark missing evidence as a gap; never manufacture it.

The Evidence Note (Blank Template) (1 of 2)

FieldTeam entry
Repository and baseline revisionThe actual repository and commit
Implemented behaviourOnly the behaviour present at that revision
Local environment and commandJava version, shell, command
Local check resultObserved exit status and relevant output
Hosted passing runRun URL or retained log, tested revision, date

The Evidence Note (Blank Template) (2 of 2)

FieldTeam entry
Deliberate failurePractice revision, failed assertion, failed run
Restored passRestored revision and passing run
Independent reviewActual reviewer, finding, correction, follow-up
Unresolved questionsOwner, impact, next decision point
Known limitationsScope boundaries relevant to interpreting the demo
  • A template, not completed evidence.

Feedback Questions (Not Document Counts)

DimensionUseful feedback question
ScopeCan the team explain the conditions under which its claim is valid?
SliceDoes the result support one observable outcome, including necessary failures?
PlanningIs review and uncertainty accounted for, and can people collaborate when needed?
TraceabilityDoes the cited check actually exercise the criterion?
WorkflowIs there real evidence of review, corrections and the integrated result?
HonestyAre proposed features, local checks and hosted runs labelled accurately?

If You Want More

  • Review whether the query slice should use duration or an exclusive end date at its interaction boundary.
  • Compare the input errors each choice creates. Update the sketch and examples.
  • Do not implement a second interface solely for this extension.
  • A suggested solution: duration matches the current reservation input and suits “two days”; an exclusive end makes boundaries explicit but may be misread as an inclusive last day.
  • The choice should follow a user walkthrough.

4.11 Questions to Think with

Concept and diagnosis

Concept Questions

  1. How do a vision, an iteration goal and an implementation task differ? Use the equipment project for each.
  2. Why can a console-based journey be a vertical slice even when it has no database?
  3. Why is total available person-time insufficient to establish a feasible iteration plan?
  4. What does a passing starter check establish, and what does it leave unproven?

Diagnosis Questions

  1. A team reports the availability story done because the screen says “available”. Its implementation calls reserve, then removes the new record. Identify the violated requirement and the state evidence you would inspect.
  2. A CI job compiles successfully, runs java -cp build/classes Chapter03AcceptanceExamples || true, then prints “all checks passed”. Explain how this can report success after an assertion failure and how you would verify the correction.

Guidance: Questions 1 and 2

  1. The vision describes the officer’s improved ability to make clear reservation decisions. The iteration goal concerns inspecting availability without changing records. A read-only operation is one task supporting it. A list of technical tasks alone does not express the user outcome.
  2. A slice is complete relative to its promised outcome when input reaches the relevant behaviour and storage decision and produces an inspectable result. A console can support that. A database or graphical interface is needed only if the outcome requires it.

Guidance: Questions 3 and 4

  1. Summed hours omit dependencies, calendar overlap, skill availability and review timing. Four people available on different days may be unable to pair or review when needed. Check the sequence and collaboration windows.
  2. The particular checks executed successfully against the compiled revision in the recorded environment. Unproven: untested cases, unspecified rules, hosted execution if only run locally, independent review, concurrency safety, user acceptance. It does not certify that US-02 exists.

Guidance: Questions 5 and 6

  1. Calling reserve violates the read-only requirement before any cleanup: a success appends a record, and eligibility can reject the request even when the item is free. Inspect before-and-after record identifiers, borrower/item identifiers and period bounds, not only the count.
  2. || true turns the failing Java command into a successful shell list. Remove the suppression, rerun with the deliberately wrong AC-01 expectation, and verify nonzero exit and no final success marker. Restore, and verify a pass.

4.12 A Different Setting

The transfer challenge

Transfer Challenge: Clinic Appointments

A small clinic wants reception staff to inspect appointment-slot availability and make bookings. It has one supplied in-memory booking routine, a draft backlog and a four-person student team with uneven availability.

  • Create a bounded first-iteration goal, a wireframe and a capacity-aware plan.
  • Identify two assumptions to revisit before real use.
  • Give one adjacency example, and explain why equipment-lending date rules cannot simply be copied into a time-based domain.
  • Show what the first automated gate would establish and what still needs human review.
  • Use synthetic appointment data only.

Transfer Guidance (1 of 2)

  • Goal: let reception demonstrate an availability enquiry for one synthetic slot without creating or altering bookings, within one running coordinator.
  • Sketch: practitioner or resource identifier, date, start time, duration, a Check action, and a result that distinguishes availability from a confirmed booking. Show the agreed time zone.
  • Assumptions to revisit: one known synthetic resource and a single agreed scheduling zone; no real appointment authority, patient identity or clinical workflow.

Transfer Guidance (2 of 2)

  • Boundary example: one appointment occupies [09:00, 09:30) and another requests [09:30, 10:00). They do not overlap under that interval model. A preparation interval could still make the second invalid, so clarify it.
  • The equipment starter uses whole dates. Do not paste LocalDate.plusDays into a minute-based rule.
  • Gate evidence: compile, run checks for the agreed booking semantics, prove assertion failure propagates.
  • Human evidence: a walkthrough that reception understands the result and time labels; stakeholder discussion of authority and assumptions.

What to Take Away, and What Comes Next

What to carry forward

Summary: A Credible Iteration

  • A credible iteration connects a bounded outcome, a thin journey, a feasible plan and inspectable evidence.
  • Scope notes expose assumptions; wireframes reveal interaction questions; acceptance examples make behaviour testable.
  • Review and automation help the team preserve a shared baseline while learning what to build next.

Summary: What Changed in the Code

  • The Chapter 4 application behaviour remains the Chapter 2 to 3 reservation version.
  • Additions: repository organisation, a repeatable checking command, a scripted demonstration and a hosted-workflow template.
  • US-02 remains planned.

Next: Chapter 5

  • Responsibilities, Extension and Substitutability.
  • Use this protected starting point to examine reasons for change.
  • Make small, protected design improvements.
  • Comprehensive CI/CD, deployment and integration-testing choices remain for Chapter 13.

Sources and Further Reading

  1. Schwaber and Sutherland: The Scrum Guide, November 2020.
  2. Oracle: The javac command, Java SE 17.
  3. GitHub Docs: Building and testing Java with Maven (context for CI; this starter runs a Bash gate).
  4. GitHub Actions: setup-java and checkout.
  5. Martin: Agile Software Development, 2002. Rubin: Essential Scrum, 2012.
  • Full references and links are in the chapter text.